Louvre 3-layer 1 strip Engineered Parquet

  
>>Our news
 
Point of installation-Direct spreading style
 
 
Suitable for geothermic and non-gerthermic type Suitable for+-2mm height difference floor Dampproof+Multi-layer wood flooring
Procedure:
l.First lay the dampproof cloth to cover the trimmed ground to prevent moisture and insulate sound.
2.Lay the multi-layer wood flooring on the dampproof cloth.
[该信息已被浏览1170次!]
 
 
 
Home   |   About us   |   Products   |   Honor   |  Technology   |   Case   |   News  |   Contact us   |   Admin

Copyright (c) 2008.IKAR flooring Co.,Ltd. Inc.